Patent · US Active

Resource management of resource-controlled system

US11042410B2 · kind B2 · utility

28Cited by
5References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 10, 2019
Grant dateJun 22, 2021
Priority date
Expiry dateMay 31, 2039

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2009/45579
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

An apparatus (5) manages resources of a resource-controlled system (1), e.g. data processing resources in a data processing system. The resource-controlled system (1) has resource-elasticity, namely it may operate in several states involving different amounts of system resources. The resource management apparatus (5) may select a modification action having at least one resource variation parameter. The resource variation parameter represents a resource quantity to be added or removed in the resource-controlled system (1). The apparatus (5) may update a value function of an adaptive learning agent (7) as a function of performance metrics (4) measured after the resources of the resource-controlled system have been modified by effecting the modification action. Responsive to a safety criterion not being fulfilled, a finer resource variation parameter may be substituted.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.