Automated fixups based on partial goal satisfaction
US11093619B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 27, 2018 |
| Grant date | Aug 17, 2021 |
| Priority date | — |
| Expiry date | Nov 8, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2221/033
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A compliance of a system is managed. Internal parameters of the system are received. One or more compliance control documents that relate to the system are identified. Each compliance control document is decomposed into one or more auditable units. Auditable units that are relevant to the system, are identified. Relevant auditable units are mapped to a corresponding available executable code. Each mapped executable code is executed. A risk associated with each relevant auditable unit that is deemed to be not compliant is identified. For each compliance control document, a compliance risk is calculated based on the identified risk. A report of compliance risk for each document is created to be displayed on a user interface of a computing device.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.