Patent · US Active

Monitoring electrical substation networks

US11101652B2 · kind B2 · utility

0Cited by
0References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 1, 2016
Grant dateAug 24, 2021
Priority date
Expiry dateMay 26, 2037

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/18
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Systems and a method for forecasting data at noninstrumented substations from data collected at instrumented substations is provided. An example method includes determining a cluster id for a noninstrumented substation, creating a model from data for instrumented substations having the cluster id, and forecasting the data for the noninstrumented station from the model.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.