System and methodology for controlling fluid flow
US11111757B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 16, 2018 |
| Grant date | Sep 7, 2021 |
| Priority date | — |
| Expiry date | May 22, 2038 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/086
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique facilitates formation of a gravel pack. A well completion is provided to facilitate improved gravel packing during a gravel packing operation and subsequent production. The well completion is constructed to freely return a gravel pack carrier fluid through a base pipe during gravel packing. A valve system is positioned to enable restriction of fluid flow into the base pipe following the gravel packing operation. The valve system may be selectively actuated to restrict the fluid flow into the base pipe via a signal such as a pressure signal or timed electric signal.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.