Patent · US Active

System and method to improve boiler and steam turbine start-up times

US11125118B1 · kind B1 · utility

2Cited by
14References
22Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 16, 2020
Grant dateSep 21, 2021
Priority date
Expiry dateMar 16, 2040

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF01K19/00
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A system for reheating a power generation system including a boiler and a mixer fluidly coupled to the boiler, a turbine first section operable to receive steam from the boiler at a first temperature. The turbine supplies steam at a second temperature to the boiler or mixer. The system also includes a first flow control valve operable to control a flow of steam through the turbine, and a sensor the sensor operable to monitor at least one operating characteristic in the boiler system. The system further includes a control unit configured to receive the monitored operating characteristic and control at least the first flow control valve, to control the amount of steam directed through the turbine.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.