Patent · US Active

Systems and methods for controlling fracturing operations using monitor well pressure

US11131176B1 · kind B1 · utility

1Cited by
9References
29Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 13, 2019
Grant dateSep 28, 2021
Priority date
Expiry dateDec 13, 2039

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/06
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Systems and methods of hydraulically fracturing subterranean formations include modifying a completion operation parameter for hydraulic fracturing a target well, the target well extending through a subterranean formation and a fracture extending from the target well as a result of the hydraulic fracturing. The modification to the completion operation is responsive to detection of a response of a monitor well extending through the subterranean formation, where the response of the monitor well resulting from interactions between the monitor well and the fracture extending from the target well.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.