Releasable resource based preemptive scheduling
US11150951B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 20, 2018 |
| Grant date | Oct 19, 2021 |
| Priority date | — |
| Expiry date | Mar 9, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/5021
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A computer-implemented method, a computer system and a computer program product for releasable resource-based preemptive scheduling. One or more currently running workloads are determined to be preempted by a pending workload. Releasable resources from the one or more currently running workloads meet required resources of the pending workload. The pending workload is dispatched so that it uses at least part of the releasable resources from the one or more currently running workloads to run.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.