Patent · US Active

Method for prediction of the duration of garbage collection for backup storage systems

US11151030B1 · kind B1 · utility

0Cited by
2References
24Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 31, 2016
Grant dateOct 19, 2021
Priority date
Expiry dateAug 20, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06N20/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A first set of garbage collection (GC) features and non-GC features associated with a storage system are received, the first set of features being associated with a predetermined start date and a time window. A learning equation is generated having a plurality of vectors of GC features and a plurality of vectors of non-GC features. For a current iteration representing a current GC process, it is determined whether a first prior GC process was started within the time window. An entry of vectors of the non-GC features of the learning equation is populated based on corresponding feature values of the first set of non-GC features, in response to determining that the first prior GC process was started within the time window. A predetermined regression algorithm is applied to the learning equation to generate a GC duration predictive model to predict a GC duration of a subsequent GC process.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.