Multi-time scale energy storage management framework for performance-based frequency regulation (FR) market
US11183840B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 21, 2019 |
| Grant date | Nov 23, 2021 |
| Priority date | — |
| Expiry date | Jan 7, 2040 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S50/10
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
The multi-time scale battery energy/storage system (BES) management framework proposed in the present disclosure can be used for day-ahead capacity scheduling and real-time BES operation control in the latest performance-based frequency regulation market. This multi-time scale BES management framework includes three control layers: long-term battery performance planning layer, day-ahead regulation capacity scheduling layer, real-time battery operation control layer. These three layers will coordinate with each other, and operate at different time scales.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.