Patent · US Active

Building HVAC system with predictive temperature and humidity control

US11193689B2 · kind B2 · utility

0Cited by
11References
21Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 14, 2019
Grant dateDec 7, 2021
Priority date
Expiry dateJun 14, 2039

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF24F2120/10
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

A predictive heating system for a building zone includes building equipment, a temperature sensor, a humidity sensor, and a predictive heating controller. The building equipment is operable to affect an environmental condition of the building zone in a heating mode of operation and a cooling mode of operation. The temperature sensor is configured to measure a temperature of the building zone. The humidity sensor is configured to measure humidify of the building zone. The predictive heating controller is configured to predict an occupancy time of the building zone over a future time period, determine a dehumidification time period before the occupancy time of the building zone, determine a heating time period before the occupancy time of the building zone, operate the building equipment to dehumidify the building zone over the dehumidification time period, and operate the building equipment to heat the building zone over the heating time period.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.