Method and system for smart operating bandwidth adaptation during power outages
US11202234B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 3, 2020 |
| Grant date | Dec 14, 2021 |
| Priority date | — |
| Expiry date | Jun 3, 2040 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D30/70
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Systems and methods are provided for adaptive bandwidth (BW) management configuring an element management control unit including a set of distribution/central units (DU/CU) for monitoring power and traffic loads at a plurality of cell sites in a network; communicating with a BW management unit coupled to the element management system to adapt BW for users at cell sites by moving users to a set of smaller bandwidth parts (BWPs) at a cell site in response to a set of conditions of AC power outages and reduced traffic loads detected by the BW management unit, and in response to at least one of the detected conditions, instructing based on data from the DU/CU to the BW management unit to move user traffic to a designated lower BWP of the set of smaller BWPs at the cell site while shutting down other BWPs at the cell site to save the power of an operating cell site.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.