Power outage processing method and connection relationship obtaining method and device
US11206556B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 28, 2019 |
| Grant date | Dec 21, 2021 |
| Priority date | — |
| Expiry date | May 28, 2039 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D30/70
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A power outage processing method: receiving, by a controller in a base station, notification information sent by a first power source, where the notification information is used to indicate that a power outage has occurred on the first power source; the base station includes M radio units, and the M radio units are supplied with power by N power sources, where each power source is connected to at least one radio unit; and the first power source is one of the N power sources, and the N power sources are all supplied with power by using a power grid, determining, by the controller based on connection relationships between the N power sources and the M radio units, a radio unit connected to the first power source; and instructing, by the controller, all or some of radio units connected to the first power source to reduce power consumption.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.