Patent · US Active

Dry process connected energy-consuming beam column joint based on corbel

US11225786B2 · kind B2 · utility

3Cited by
3References
5Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 24, 2020
Grant dateJan 18, 2022
Priority date
Expiry dateSep 24, 2040

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE04C3/34
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A dry process connected energy-consuming beam column joint based on a corbel includes a prefabricated concrete corbel column, pre-buried steel plates and connecting steel plates, wherein the corbel section of the prefabricated concrete corbel column is stepped, and a notch section of a prefabricated concrete notch beam is matched with the stepped section of the corbel and is in lap joint to the stepped section; the pre-buried steel plates are separately pre-buried on the upper and lower surfaces of the corbel and the prefabricated concrete notch beam, friction plates are arranged outside the pre-buried steel plates, and slight tooth spaces are arranged on the sides, facing the pre-buried steel plates, of the friction plates; and the connecting steel plates are arranged on the left and right sides of the prefabricated concrete notch beam and the corbel lap joint section.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.