Patent · US Active

Simulated annealing optimization of well production forecasts

US11236604B2 · kind B2 · utility

0Cited by
1References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 23, 2018
Grant dateFeb 1, 2022
Priority date
Expiry dateJun 11, 2040

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

System and methods for optimizing flow distribution across multiple production zones are provided. A flow distribution is assigned to a plurality of production zones along a wellbore within a formation. A temperature value is estimated for each of the production zones, based on the assigned flow distribution. The estimated temperature value is compared with an actual temperature value determined for each production zone. An error amount for the estimated temperature value is calculated based on the comparison. Based on the error amount, it is determined whether or not the flow distribution has reached a global optimum. The assigning, the estimating, the comparing, the calculating, and the determining are repeated until it is determined that the flow distribution assigned to the plurality of production zones has reached the global optimum.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.