Patent · US Active

Well planning using geomechanics nudge

US11242746B2 · kind B2 · utility

0Cited by
4References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 16, 2019
Grant dateFeb 8, 2022
Priority date
Expiry dateFeb 15, 2040

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for planning and drilling a well includes receiving geomechanical and geological data for a subterranean domain, and receiving an initial well trajectory including a well path and survey points. The method includes conducting a wellbore stability analysis along the well trajectory based in part on the geomechanical and geological data. Conducting the wellbore stability analysis includes identifying a subset of the well path intervals along the well trajectory as having a risk for instability. The method includes calculating a geomechanics nudge for one or more survey points along the well trajectory. The geomechanics nudge is calculated as a derivative of the wellbore stability at the one or more survey points. The method includes modifying the one or more survey points and the one or more well path intervals connected thereto based in part on the geomechanics nudge to generate a modified well trajectory.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.