Optimized factory schedule and layout generation
US11256241B1 · kind B1 · utility
3Cited by
11References
28Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Sep 14, 2020 |
| Grant date | Feb 22, 2022 |
| Priority date | — |
| Expiry date | Sep 14, 2040 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
Systems and methods for optimizing factory scheduling, layout or both which represent active factory elements (human and machine) as computational objects and simulate factory operation to optimize a solution. This enables the efficient assembly of customized products, accommodates variable demand, and mitigates unplanned events (floor blockages, machines/IMRs/workcell/workers downtime, variable quantity, location, and destination of supply parts).
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.