Patent · US Active

Integrated planning of production and/or maintenance plans

US11281196B2 · kind B2 · utility

0Cited by
1References
13Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJan 30, 2018
Grant dateMar 22, 2022
Priority date
Expiry dateMar 18, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A production planning system (6) for a raw materials industry plant (ANL), which determines the production planning data (Pi) thereof and specifies said data to the automation system (1) of the plant (ANL). A state monitoring system (7) determines previous and future anticipated states (Z1) of components of the plant (ANL). A quality determination system (8) determines states (Z2) of output products (Ai) produced and still to be produced by the plant (ANL) and/or past and future states (Z3) of the plant (ANL) as a whole. A maintenance planning system (9) and/or the production planning system (6) receive, from the state monitoring system (7), the states (Z1) of the components of the plant (ANL), determined by the state monitoring system (7) and, from the quality determination system (8), the states (Z2 and Z3) of the output products (Ai) and/or of the plant (ANL) as a whole, determined by the quality determination system (8). They consider the data received from the state monitoring system (7) and from the quality determination system (8) in the determination of maintenance planning data (W) and/or the production planning data (Pi).

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.