Modifying resources for composed systems based on resource models
US11288102B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 29, 2017 |
| Grant date | Mar 29, 2022 |
| Priority date | — |
| Expiry date | Feb 23, 2038 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/1001
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Modifying resources for composed systems based on resource models including receiving a workload for execution on a composed system; extracting workload characteristics from the workload; matching the workload characteristics to a resource model, wherein the resource model comprises an initial configuration of compute elements for the composed system and a configuration modification to the initial configuration of the compute elements as the workload executes; composing the composed system using the initial configuration of compute elements described by the resource model, wherein the composed system comprises a subset of compute elements from a resource pool of compute elements; and executing, based on the resource model, the workload using the composed system, including modifying the initial configuration of the compute elements according to the resource model.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.