Patent · US Active

Recovery maturity index (RMI)-based control of disaster recovery

US11288150B2 · kind B2 · utility

1Cited by
6References
18Claims
0Family size

Assignee

Inventor

Key dates

Filing dateMay 6, 2020
Grant dateMar 29, 2022
Priority date
Expiry dateMay 6, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/3466
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A Recovery Maturity Index 1 (RMM) is used to determine whether a particular Information Technology (IT) production environment is relatively mature enough to successfully execute the disaster recovery (DR). The RMI provides a quantitative analysis in terms of a set of categories for elements that characterize the environment and multiple elements for each category. At least some of the elements depend upon the extent to which automation components have been leveraged for disaster recovery. A summation of the scoring elements, which may be a weighted summation, results in an overall quantitative metric. The metric can used to determine whether or not disaster recovery can be expected to be successful.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.