Method for injecting non-condensable gas or in-situ combustion to recover remaining oil in a heavy oil reservoir with bottom water
US11306571B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Mar 19, 2020 |
| Grant date | Apr 19, 2022 |
| Priority date | — |
| Expiry date | Mar 19, 2040 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/2401
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for injecting non-condensable gas or application of in-situ combustion to recover remaining oil in a heavy oil reservoir with bottom water includes: drilling a new horizontal well in an oil layer between the existing horizontal production well location and the bottom water layer; preheating the new horizontal well; after the horizontal section of the horizontal well is in thermal communication with the upper steam/gas chamber, performing gas injection in existing wells to maintain pressure slightly higher or similar to the pressure of the bottom water layer, and converting the horizontal well into a continuous production well; drilling a vertical well in the unswept reservoir area; establishing a fluid communication in the oil layer between the vertical well and the horizontal well, injecting air or oxygen into the vertical well; and in the later stage of the horizontal well, stopping gas injection and gradually reducing the pressure in the steam/gas chamber.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.