Patent · US Active

Method for lowering oil pipe in gas well without well-killing, soluble bridge plug and material preparation method thereof

US11313192B2 · kind B2 · utility

1Cited by
8References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 4, 2018
Grant dateApr 26, 2022
Priority date
Expiry dateSep 13, 2038

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/10
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The present invention discloses a method for lowering an oil pipe in a gas well without well-killing, a soluble bridge plug and a material preparation method thereof, wherein, the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore; injecting water in the wellbore after the pressure in the wellbore has been relieved so as to replace gases in the wellbore; and lowering an oil pipe in the wellbore to the location of the bridge plug. The method for lowering an oil pipe in a gas well without well-killing, the soluble bridge plug and the material preparation method thereof provided in the present invention successfully solve the problem of high cost for lowering an oil pipe under pressure after a fracturing fluid has been injected into the casing.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.