Patent · US Active

Pre-hydration of friction reducers for wellbore fluids

US11313212B1 · kind B1 · utility

0Cited by
2References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 7, 2021
Grant dateApr 26, 2022
Priority date
Expiry dateApr 7, 2041

Classification

  • Technology area (CPC C)Chemistry; Metallurgy
  • CPC primaryC09K2208/28
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Friction reducers can be used in fluids for oil and gas operations. Friction reducers can be water-hydratable and can decrease the friction within wellbore components after fully hydrating. The friction reducer can be pre-hydrated at the well site. The friction reducer and water can be combined into a static mixer of a pre-hydration apparatus that forms a mixed fluid. The friction reducer can be retained in the pre-hydration apparatus for a sufficient period of time to allow the friction reducer to hydrate. The mixed fluid containing the pre-hydrated friction reducer can then be added to a base fluid to form a treatment fluid. The treatment fluid can be a fracturing fluid. The pre-hydrated friction reducer can provide an immediate reduction in friction to the treatment fluid as the treatment fluid is being pumped into the wellbore.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.