Systems and methods for rig scheduling with optimal fleet sizing

US11321788B2 · kind B2 · utility

0Cited by
0References
13Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 22, 2018
Grant dateMay 3, 2022
Priority date
Expiry dateApr 11, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06314
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems and methods for optimizing oilfield rig fleet scheduling and deployment are disclosed. Wells are identified to have time constraints by which they are grouped into “ON”, “BY”, and “ADD” categories. ON wells have a beginning drilling availability window; BY wells have an ending drilling availability time only; and ADD wells have no beginning or ending time of drilling availability. The systems and methods optimize scheduling with ON wells having higher priority than BY wells, and BY wells having higher priority than ADD wells.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.