Patent · US Active

Method for monitoring and controlling cluster efficiency

US11346212B2 · kind B2 · utility

0Cited by
1References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 9, 2019
Grant dateMay 31, 2022
Priority date
Expiry dateAug 14, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2111/10
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The disclosure provides a method and a computer program product for determining distribution of fracturing components in fracture clusters of a wellbore, and a fracturing controller. An example of the method includes: (1) modifying surface flow rates for pumping a fracturing component into the wellbore, (2) measuring surface pressures for the surface flow rates, and (3) determining flow rates for the fracture clusters employing the surface flow rates, the surface pressures, and a model representing flow distribution of the wellbore. An example fracturing controller includes (1) an interface configured to receive surface flow rates and corresponding surface pressures for pumping a fracturing component into a wellbore, wherein the surface flow rates are modified in a series of steps, and (2) a processor configured to determine flow rates for the fracture clusters employing the surface flow rates, the surface pressures, and a model representing flow distribution of the wellbore.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.