Patent · US Active

Central plant optimization planning tool with advanced user interface

US11360451B2 · kind B2 · utility

17Cited by
2References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 29, 2019
Grant dateJun 14, 2022
Priority date
Expiry dateAug 6, 2040

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A planning tool used to facilitate more efficient design of a central plant is configured to provide an advanced user interface. The user interface includes a symbol palette with selectable symbols that represent resource suppliers, subplants, energy loads, and resource storage devices associated with a central plant. The user interface allows users to drag these symbols onto a workspace and form various connections between the symbols. The user interface provides feedback to the user and prevents improper connections by evaluating user inputs according to a set of rules. The rules define valid relationships between the resource suppliers, subplants, energy loads, and resource storage devices. The user interface also allows users to specify equipment contained within the subplants. After a central plant model is created via the user interface, users can simulate operation of a central plant according to the model for planning, budgeting, and/or design considerations.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.