Resource management for parent child workload
US11360804B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 29, 2018 |
| Grant date | Jun 14, 2022 |
| Priority date | — |
| Expiry date | Mar 25, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/484
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
For resource management for a parent child workload, a processor organizes a plurality of processes into a plurality of process groups. Each process group includes a given parent process and all child processes of the given parent process. Each process group has a process level. The processor further calculates a process cost for each process group and assigns a process priority to each process group based on the process cost for the process group. The processor iteratively assigns computing resources to subgroups of a given process group with a highest process priority at a given process level.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.