Managing transitioning of computing system to power-on state from standby-power state
US11366673B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 24, 2021 |
| Grant date | Jun 21, 2022 |
| Priority date | — |
| Expiry date | Feb 24, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F1/3296
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Example implementations relate to system and method of managing transitioning of a computing system to a power-on state from a standby-power state. The computing system includes a manageability controller, an initialization controller, an auxiliary device, and a processor. In such examples, the manageability controller may first determine an initialization status of the auxiliary device from a data corresponding to the auxiliary device, when the computing system is transitioning from the standby-power state to the power-on state. In one or more examples, the initialization status may include the auxiliary device in an initialized stage or a non-initialized stage. Later, the manageability controller may direct the initialization controller to delay the transitioning of the computing system from the standby-power state to the power-on state, in response to determining that the initialization status of the auxiliary device is in the non-initialized stage.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.