Application deployment in a multi-cluster environment
US11368539B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | May 27, 2021 |
| Grant date | Jun 21, 2022 |
| Priority date | — |
| Expiry date | May 27, 2041 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L41/147
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Embodiments of the present disclosure relate to application deployment in a multi-cluster environment. In an embodiment, a computer-implemented method is disclosed. According to the method, first information about a resource requirement of an application is sent to a plurality of managed computing clusters. A plurality of predicted deployment results are received from the plurality of managed computing clusters, which indicate whether the application is to be partially or fully and successfully deployed on the plurality of managed computing clusters. In accordance with a determination, from the plurality of predicted deployment results, that a plurality of functions of the application fail to be deployed on a single managed computing cluster, at least two managed computing clusters are selected from the plurality of managed computing clusters and the application is deployed on the at least two managed computing clusters. In other embodiments, a system and a computer program product are disclosed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.