Database recovery based on workload priorities
US11372734B1 · kind B1 · utility
1Cited by
4References
20Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jan 26, 2021 |
| Grant date | Jun 28, 2022 |
| Priority date | — |
| Expiry date | Jan 26, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2201/82
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Database recovery is based on workload priorities. A database workload is divided into a plurality of workload groups. A workload group of the plurality of workload groups is selected for recovery, in which the selecting is based on a priority of the workload group. One or more recovery actions are performed for the workload group selected for recovery.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.