Patent · US Active

Volumetric fracturing method of temporarily plugging and diverting through functional slick water with oil displacement agent injected simultaneously

US11408264B2 · kind B2 · utility

0Cited by
7References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateNov 19, 2020
Grant dateAug 9, 2022
Priority date
Expiry dateJan 14, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Disclosed is a method for determining three-dimensional in-situ stress based on displacement measurement of borehole wall, including the following steps: pumping the prefluid and the sand-carrying fluid into the target interval, and injecting the biological oil displacement agent into the target interval in sequence; pumping temporary plugging agent into the target layer to implement crack plugging diverting; pumping the sand-carrying liquid into the target interval, and injecting the biological oil displacement agent into the target interval. The beneficial effect of the technical scheme proposed in this disclosure is: by injecting oil displacement agent to fracturing fluid, the temporary plugging diverting fracturing is integrated constructed with enhanced oil recovery, at the same time, it can overcome the incomplete removal of temporary plugging agent and the water lock effect of fracturing fluid caused by diverting fracturing.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.