Optimizing user task schedules in a customer relationship management platform
US11416791B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 22, 2019 |
| Grant date | Aug 16, 2022 |
| Priority date | — |
| Expiry date | Sep 18, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06316
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Systems and methods for optimizing user task schedules in a customer relationship management (CRM) platform is disclosed. The system may optimally input tasks into time slots in a user schedule to generate the optimized user task schedule. The system may generate a plurality of user task schedules and calculate a total task win probability for each of the user task schedules. The system may comprise the total task win probabilities and select the user task schedule having the greatest total task win probability. The system may also perform a genetic processing analysis of the user task schedules to further optimize task placement in the user task schedule.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.