Real-time well construction process inference through probabilistic data fusion
US11421523B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 27, 2018 |
| Grant date | Aug 23, 2022 |
| Priority date | — |
| Expiry date | Mar 28, 2039 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B2200/22
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method includes acquiring data during rig operations where the rig operations include operations that utilize a bit to drill rock and where the data include different types of data; analyzing the data utilizing a probabilistic mixture model for modes, a detection engine for trends and a network model for an inference based at least in part on at least one of a mode and a trend; and outputting information as to the inference where the inference characterizes a relationship between the bit and the rock.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.