Efficient utilization of spare datacenter capacity

US11435812B1 · kind B1 · utility

0Cited by
9References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 16, 2020
Grant dateSep 6, 2022
Priority date
Expiry dateJul 18, 2040

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A spare capacity status of each of multiple computing systems in a data center is monitored. Temporary workloads are assigned to these computing systems if there exists sufficient additional electrical power supply and capacity on power distribution lines. Thus, computing systems that are typically not productively used, such as those that are about to be decommissioned, have not yet been assigned for normal servicing, are reserved for special circumstances, or that are assigned to services that are currently in low demand, are temporarily used for productive data center purposes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.