Scheduling tasks based on calculated processor performance efficiencies
US11442774B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 19, 2020 |
| Grant date | Sep 13, 2022 |
| Priority date | — |
| Expiry date | May 21, 2040 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A scheduling method includes calculating required performance for a given task, calculating use performance and real performance of a candidate processor, calculating power corresponding to the real performance, calculating expected energy usage of the candidate processor based on the required performance, the use performance, the real performance, and the calculated power and calculating performance efficiency of the candidate processor by considering a ratio of the expected energy usage to the real performance.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.