Patent · US Active

Reservoir simulation modeling with well trajectory at true positions in grid simulation models

US11454105B2 · kind B2 · utility

0Cited by
0References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 25, 2019
Grant dateSep 27, 2022
Priority date
Expiry dateAug 19, 2040

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An unstructured grid model with actual well trajectory of individual multilateral wells of a subsurface reservoir is formed. Well trajectory data obtained during drilling of the wells and corresponding to well trajectory data stored as a structured grid model is provided as an input data set for unstructured grid simulation. The unstructured grid model may be formed in a computerized mainframe processor system, or by parallel reservoir simulation by processor nodes of a multicore processor of parallel processor nodes synchronized and under control of a master node.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.