Patent · US Active

Task scheduling simulation system

US11455189B2 · kind B2 · utility

0Cited by
5References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 9, 2019
Grant dateSep 27, 2022
Priority date
Expiry dateFeb 1, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F30/20
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

The application provides a task scheduling simulation system, comprising a data preprocessing subsystem and a task scheduling subsystem. The data preprocessing subsystem filters the input cloud computing log information for abnormal data and extracts the running time of each task. The task scheduling subsystem enqueues or dequeues tasks from the batch task and real-time task running queues of each node, and keeps the tasks currently running in the cluster consistent with the actual production environment, and updates the number of CPU cores and the used and available memory capacity of each node according to resource requirement of each task. The mixed scheduling simulation of batch tasks and online tasks can be realized, and the resource simulation of the heterogeneous CPU core number and memory capacity of the cluster nodes can be simulated.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.