Building HVAC system with modular cascaded model
US11480360B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 19, 2020 |
| Grant date | Oct 25, 2022 |
| Priority date | — |
| Expiry date | Jun 19, 2040 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/2614
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A controller for HVAC equipment stores a cascaded model that includes a disturbance model configured to predict a heat disturbance affecting the building zone as a function of one or more exogenous parameters and a physics model configured to predict a temperature of the building zone as a function of the heat disturbance and an amount of heating or cooling provided to the building zone by HVAC equipment. The processing circuit is configured to execute a combined training procedure to determine parameters of the disturbance model and parameters of the physics model, generate control signals for the HVAC equipment using the disturbance model to predict the heat disturbance and applying the heat disturbance as an input to the physics model, and operate the HVAC equipment to provide the heating or cooling to the building zone in accordance with the control signals.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.