Patent · US Active

Process for infill well development in a subsurface reservoir

US11492896B2 · kind B2 · utility

0Cited by
1References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 6, 2019
Grant dateNov 8, 2022
Priority date
Expiry dateMar 14, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/22
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for determining a location and trajectory for a new wellbore relative to an adjacent wellbore includes: receiving controllable variable data and uncontrollable variable data related to fracturing a formation by a stimulation operation in a first wellbore penetrating the formation; receiving pressure communication event or pressure non-communication event identification data related to identification of a pressure communication event or pressure non-communication event in a second wellbore penetrating the formation in response to the fracturing; extracting features from the controllable and uncontrollable variable data to provide extracted features; detecting a pressure communication event using the extracted features and the pressure communication event or pressure non-communication event identification data using an analytic technique; identifying one or more quantified causes of the detected pressure communication event using an artificial intelligence technique; and determining the location and trajectory of the new wellbore using the one or more quantified causes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.