Production management apparatus, method, and non-transitory medium
US11501388B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 30, 2017 |
| Grant date | Nov 15, 2022 |
| Priority date | — |
| Expiry date | Jan 26, 2040 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
There are provided a repair determination section that determines, based on failure information on the facility for manufacturing a product, a repair time required to repair the facility, and a recovery plan creation section that creates a recovery plan in accordance with a predetermined production evaluation indicator, based on the repair time and production information on a line with the failed facility, one or more other facilities, and on one or more other lines.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.