Hybrid cluster recovery techniques
US11516072B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 18, 2019 |
| Grant date | Nov 29, 2022 |
| Priority date | — |
| Expiry date | Oct 18, 2039 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/1095
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
At a recovery manager associated with a cluster, a determination is made as to whether a replacement for a first node of the cluster can be elected by the other nodes of the cluster using a first election protocol. The recovery manager selects a second node of the cluster as a replacement for the first node, based on data item replication progress made at the node, and transmits an indication that the second node has been selected to one or more nodes of the cluster.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.