Systems and methods for manufacturing and delivering fracturing fluid to multiple wells for conducting fracturing operations
US11519252B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 7, 2021 |
| Grant date | Dec 6, 2022 |
| Priority date | — |
| Expiry date | May 7, 2041 |
Classification
- Technology area (CPC B)Performing Operations; Transporting
- CPC primaryB01F2101/49
- WIPO fieldChemical engineering
- WIPO sectorChemistry
Abstract
A method of conducting fracturing operations at multiple wellsites in a field. The method may include manufacturing a first fracturing fluid concentrate at a fluid manufacturing plant located at a sand mine of the field using sand produced from the sand mine. The method may also include pumping the first fracturing fluid concentrate from the fluid manufacturing plant to a first well and a second well of the multiple wellsites. The method may further include injecting the first fracturing fluid concentrate into a first well at the first wellsite.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.