Patent · US Active

Systems and methods for manufacturing and delivering fracturing fluid to multiple wells for conducting fracturing operations

US11519252B2 · kind B2 · utility

3Cited by
9References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 7, 2021
Grant dateDec 6, 2022
Priority date
Expiry dateMay 7, 2041

Classification

  • Technology area (CPC B)Performing Operations; Transporting
  • CPC primaryB01F2101/49
  • WIPO fieldChemical engineering
  • WIPO sectorChemistry

Abstract

A method of conducting fracturing operations at multiple wellsites in a field. The method may include manufacturing a first fracturing fluid concentrate at a fluid manufacturing plant located at a sand mine of the field using sand produced from the sand mine. The method may also include pumping the first fracturing fluid concentrate from the fluid manufacturing plant to a first well and a second well of the multiple wellsites. The method may further include injecting the first fracturing fluid concentrate into a first well at the first wellsite.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.