Patent · US Active

System and methodology for high pressure alternate path

US11525340B2 · kind B2 · utility

1Cited by
3References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 29, 2019
Grant dateDec 13, 2022
Priority date
Expiry dateJul 3, 2039

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/04
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A technique facilitates formation of a gravel pack along relatively lengthy wellbores. According to an embodiment, a completion system comprises a plurality of screen assemblies. The completion system also has an alternate path system disposed along the plurality of screen assemblies. The alternate path system includes shunt tubes, e.g. transport tubes, coupled together by jumper tubes. An anti-buckling structure is coupled to each jumper tube to prevent buckling when high operational pressures, e.g. operating pressures of 9000 psi or higher, are applied to the alternate path system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.