System and methodology for high pressure alternate path
US11525340B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 29, 2019 |
| Grant date | Dec 13, 2022 |
| Priority date | — |
| Expiry date | Jul 3, 2039 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/04
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique facilitates formation of a gravel pack along relatively lengthy wellbores. According to an embodiment, a completion system comprises a plurality of screen assemblies. The completion system also has an alternate path system disposed along the plurality of screen assemblies. The alternate path system includes shunt tubes, e.g. transport tubes, coupled together by jumper tubes. An anti-buckling structure is coupled to each jumper tube to prevent buckling when high operational pressures, e.g. operating pressures of 9000 psi or higher, are applied to the alternate path system.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.