Patent · US Active

Intelligence driven method and system for multi-factor optimization of schedules and resource recommendations for smart construction

US11531943B1 · kind B1 · utility

6Cited by
8References
20Claims
0Family size

Assignee

Inventor

Key dates

Filing dateMar 1, 2022
Grant dateDec 20, 2022
Priority date
Expiry dateMar 1, 2042

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06N3/0475
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Techniques to generate a digitally optimized schedule for a construction activity to meet a construction objective(s) of a construction project are disclosed. An artificial intelligence system receives a plurality of input data sets that impact the construction project. Each of the plurality of input data sets is processed to achieve the construction objective(s). The artificial intelligence system processes the plurality of input data sets using a respective ensemble of machine learning models. The artificial intelligence system generates machine learning validated intermediate output data sets corresponding to each of the plurality of input data sets. The artificial intelligence system implements a supervisory machine learning model to generate an optimized schedule for the construction activity based on the machine learning validated intermediate output data sets and the construction objective(s).