Patent · US Active

Replication of planned working time information

US11556899B2 · kind B2 · utility

0Cited by
3References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 23, 2019
Grant dateJan 17, 2023
Priority date
Expiry dateMay 14, 2041

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/105
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Technologies are described for replicating selected changes to planned working time from a first system, such as an HR system, to a second system, such as a payroll system. For example, upon receiving an indication of a change to a planned working time for one or more workers on one or more days, the first system can evaluate the change to determine whether it should be replicated to the second system. The determination can be based on whether the change is a temporary change, as well as based on information read from a data replication configuration object, a data replication period object, and/or an in-sync work schedule object. Upon determining that the change should be replicated to the second system, a data replication proxy object can be created based on the change and used to transmit data regarding the change for replication at the second system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.