Patent · US Active

Construction method of reclaiming land from the sea based on basement utilization

US11566390B2 · kind B2 · utility

0Cited by
4References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 31, 2020
Grant dateJan 31, 2023
Priority date
Expiry dateJan 11, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A10/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A construction method of reclaiming land from the sea based on the basement utilization, which implementation steps are as follows: a. installing a dike along the coastline, enclosing a central reclamation area by the dike and the coastline; b. installing crisscross enclosures in the central reclamation area, dividing the central reclamation area into a mesh area by the enclosure and the dike; c, pumping drainage of seawater in a block area in the mesh area, forming land in the block area; d. constructing the enclosure in the mesh reclamation area, using the enclosure and subsidiary roads to form road arteriality; the block area being lower than the height of the enclosure, constituting a grid-like high-road/low-land land supply mode; e. developing the block area into an underground space area.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.