Adjusting wellbore plug and abandonment operation using emission data
US11566515B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 1, 2021 |
| Grant date | Jan 31, 2023 |
| Priority date | — |
| Expiry date | Aug 11, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06N20/00
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A system can include one or more sensors at a wellsite. The system can detect first emission data about emissions with respect to a wellbore over a first period of time. The system can detect second emission data about emissions with respect to the wellbore over a second period of time. The system can determine an adjustment to a plug and abandonment operation with respect to the wellbore based on the first emission data. The system can determine an amount of reduction in emissions from the wellbore using the first emission data and the second emission data. The system can output the amount of reduction in the emissions.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.