Patent · US Active

Processing facility to produce hydrogen and petrochemicals

US11572517B2 · kind B2 · utility

0Cited by
73References
37Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 3, 2019
Grant dateFeb 7, 2023
Priority date
Expiry dateNov 27, 2040

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P30/40
  • WIPO fieldChemical engineering
  • WIPO sectorChemistry

Abstract

A processing facility is provided that includes a feedstock separation system configured to separate a feed stream into a lights stream and a heavies stream, a hydrogen production system configured to produce hydrogen and carbon dioxide from the lights stream, and a carbon dioxide conversion system configured to produce synthetic hydrocarbons or the carbon dioxide. The processing facility also includes a hydroprocessing system configured to process the heavies stream, and a hydroprocessor separation system configured to separate a hydroprocessing system effluent into a separator tops stream and a separator bottoms stream, wherein the separator bottoms stream is fed to the hydrogen production system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.