Management of multiple switching-synchronized measurements using combined prioritized measurement and round-robin sequence measurement
US11575369B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 7, 2021 |
| Grant date | Feb 7, 2023 |
| Priority date | — |
| Expiry date | Dec 7, 2041 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH03K2217/0027
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A method for operating a gate driver system includes measuring a first parameter according to a first priority schedule synchronously to a first edge of a switching signal generated by a gate driver integrated circuit and having a variable duty cycle. The method includes after measuring the first parameter of the gate driver system and prior to a second edge of the switching signal, measuring at least a second parameter of the gate driver system according to a first round-robin schedule synchronously to the first edge of the switching signal.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.