Patent · US Active

Method and system for predicting resource reallocation in a power zone group

US11579943B2 · kind B2 · utility

1Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 13, 2019
Grant dateFeb 14, 2023
Priority date
Expiry dateOct 12, 2040

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for managing data includes obtaining, by a first data node, a notification, wherein the first data node is associated with a first power zone group (PZG), and in response to the notification: selecting a second data node, wherein the second data node is not associated with the first PZG, sending a data processing request to the second data node, obtaining a response based on the data processing request, wherein the response specifies a confirmation by the second data node to service the data processing request, storing a ledger entry in a ledger service that indicates the confirmation, and initiating a data transfer based on the data processing request, wherein the first data node is associated with the PZG based on a primary power source of the first data node.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.