Patent · US Active

Method to predict overpressure uncertainty from normal compaction trendline uncertainty

US11591900B2 · kind B2 · utility

0Cited by
8References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 8, 2021
Grant dateFeb 28, 2023
Priority date
Expiry dateAug 24, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B21/08
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for predicting a pressure window for drilling a borehole in a formation includes: obtaining a pore pressure related data value of the formation using a data acquisition tool; predicting pore pressure uncertainty from the pore pressure related data value of the formation using a processor; estimating uncertainty of a pressure window for drilling fluid using the predicted pore pressure uncertainty using a processor; and applying the estimated uncertainty to the pressure window to provide a modified pressure window using a processor.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.